Grid Cells

The cells in the grid will reflect the number of existing planned/assigned hours for a particular time period (e.g. month).  Additionally, the resource planner/assigner can quickly add or change hours via these cells.

When saved, these cell values will be translated into individual plan/assignment entries having a date range from the beginning of the period to the end of the period (e.g. a monthly Jan-05 entry will be saved as 1/1/05 --> 1/31/05).  These entries can be viewed and edited via the other planning and assigning screens such as the People Plans >> List  and People Assignments >> List.

Additional Plan/Assignment details for each cell can be manipulated via the grid by double clicking on a cell, a person's name, a column header or the Name label (to edit the entire grid).  See the Edit Plan/Assignment Details section below for additional information about editing additional details.

Grayed Out Entries