Item
This is an optional field. It must be an active item valid for the project, if project is specified. Item must have UOM and rates specified. If they are not specified on the PO details page, then the Admin >> Setup Item page must specify.
If the PO is associated with a PR, this field is pre-populated with the value from the latest approved PR line.