Location

The Location field will contain a list of Locations to select for charging.

Unanet Administrators define the full list of Locations via the Admin Setup screens.  Project Managers can associate a sub-set of Locations as being available for charging on a project by project basis (via the Project Profile screens).

If the Hide Location on Timesheet Edit (unatime.timesheet.hide.location) property is set to false, this field is available on the timesheet.  By default, this field is not available.  

This drop-down list will be populated with any locations that the user is authorized to charge time against (for this project, for this time period), or enter items against.  This may include the Master Locations  list, the Project Locations  list, or assignment specific Locations.  When this field is hidden, the system will attempt to populate the appropriate Location based on the project and assignment settings.

Check out Location Defaulting for more information.