Number
This field contains a system generated number to represent the each task. Note that top level tasks (those that do not have a parent task) are represented by a whole number (e.g. 1), while subordinate / child tasks have a dot number representation for each level of indentation (e.g. 1.1).
The Show Task Work Breakdown Structure Numbers (unatime.tasks.show_numbers) property can be configured to include this number in the display of tasks throughout the Unanet product.