Task
This field is optional for the PR.
The tasks available will be limited to:
Only those tasks having an Owning Organization (should one be specified) that belongs to the same Legal Entity as the Legal Entity specified on the PR.
Those tasks that have the following checked: Allow Time Reporting (for labor detail lines), Allow Expense Reporting (for expense detail lines), or Allow Item Reporting (for item detail lines), unless task is using the project setting and reporting is allowed on the project level.
This field is only editable on the original PR. It is read-only on the Mod.
Note: If the detail lines have different tasks, the task field on the summary will not have any values. If all detail lines have the same task, then the task field on the summary will have that task.