Task
If the Person Default option was selected, this field will contain the text Person Default, otherwise, this field will contain a drop-down list of open tasks for the selected project. Note that if the project identified is configured to require a task, selecting a value in this list will be required.
When Person Default is specified on the search screen, the task to be used for each user being populated will be the task defined in each user's profile (i.e. their default project / task). If this option is used and a user does not have a default project/task (or that task is closed), the user will appear in the section titled "Missing Defaults..." and those users will not have their time populated.