The Forecast Options selection criteria is used to indicate what should be included in the report output.  

 

 

 

Periodic Report Notes:

This control will only influence the calculated remaining allocated amounts for the plans and assignments that intersect with the Use Actuals Through Date.

When clicking through to a Periodic Report from a Chart (while using this Remaining option), note that the targeted periodic report will not reflect consistent/matching amounts (as the underlying report is unaware of the Actuals Through Date criteria from the original chart).  You can, however, directly run the Periodic Report with this Remaining option and get accurate results.

 

 

Fixed Price Note: The Include Actuals control has no bearing on the way FP items are included in the report, why?